Case Study

Technology Transformation

Technology Transformation

Before adopting 3D reality capture hardware and software, JFD Engineering relied on a total station. Their traditional approach involved two people working in the field. After surveying, these two people would return to the office to create drawings. This method worked well in terms of accuracy — but during a labor shortage in the construction industry, it resulted in prolonged working hours for the company.

As such, they made the switch to a 3D laser scanner. Their old total station required two people to do the job; the FARO® Focus Premium Laser Scanner required only one operator.

For JFD Engineering, this immediately doubled their work efficiency and operational efficiency.

Download the full case study to read how this surveying firm solved construction industry labor shortage issues and tackled 3D (“dirty, difficult, and dangerous”) challenges on their jobsites by switching to 3D scanners.

Case Study
Awareness
Build & Construct
Design & Plan
Surveying & Measurement
As-Built Capture & Modeling
Construction Quality Control
Architecture, Engineering, Construction
Measurement Service Providers
3D Scanners
Software - Architecture, Engineering & Construction
Focus
SCENE
FARO Sphere
Architecture, Engineering & Construction

Subscribe to our newsletter to stay up to date.

Related Content

Filters

Filters